Mixed utilityLogan City
Temple Heights reconstruction.
Mixed-utility reconstruction for Logan City, delivered on schedule with multiple subcontractors and live engineering coordination.
Project detail
The work,
in detail.
ClientLogan City
LocationLogan, UT
Year2024
RoleGeneral contractor
Duration~5 months
Contract value~$1.2M
StatusDelivered on schedule
Scope of work
- ~3,800 LF water main replacement (8–12 in. PVC C900)
- Sanitary sewer rehabilitation with new service laterals
- Storm drain inlets, conveyance pipe, and outfall
- Full roadway section and surface restoration
- Resident access maintained throughout construction
On the job
Temple Heights was a full corridor reconstruction for Logan City: aging water, sewer, and storm utilities replaced under a single contract while keeping the street open to the people who live on it.
We ran the critical path with our own crews and coordinated several specialty subs, holding weekly engineering reviews with the City. Daily logs, testing records, and inspection sign-offs were submitted as the work happened, and the job closed out on schedule with no outstanding punch items.
On site
From the jobsite.


Got a job
Does your project look like these?
Send us the plans and a deadline. If it’s a job for our crew, we’ll have a clean number back on your timeline.