Storm drainKearns City
Kearns 4800 W storm drain.
Storm drain installation along 4800 W for Kearns City. Conveyance pipe, inlets, and outfall work with full traffic control through a live corridor.
Project detail
The work,
in detail.
ClientKearns City
LocationKearns, UT
Year2025
RoleGeneral contractor
Duration~3 months
Contract valueOn request
StatusOn schedule
Scope of work
- Storm drain along 4800 W
- Conveyance pipe, inlets, and outfall
- Full traffic control through a live corridor
- Surface restoration to township standard
On the job
The 4800 W storm drain runs through a live Kearns corridor, so the traffic-control and phasing plan mattered as much as the pipe.
We kept the public moving and the inspector informed, with conveyance, inlets, and outfall installed to the township’s standard.
Got a job
Does your project look like these?
Send us the plans and a deadline. If it’s a job for our crew, we’ll have a clean number back on your timeline.