Kearns 4800 W storm drain installationStorm drain

Kearns City

Kearns 4800 W storm drain.

Storm drain installation along 4800 W for Kearns City. Conveyance pipe, inlets, and outfall work with full traffic control through a live corridor.

Project detail

The work,
in detail.

ClientKearns City
LocationKearns, UT
Year2025
RoleGeneral contractor
Duration~3 months
Contract valueOn request
StatusOn schedule

Scope of work

  • Storm drain along 4800 W
  • Conveyance pipe, inlets, and outfall
  • Full traffic control through a live corridor
  • Surface restoration to township standard

On the job

The 4800 W storm drain runs through a live Kearns corridor, so the traffic-control and phasing plan mattered as much as the pipe.

We kept the public moving and the inspector informed, with conveyance, inlets, and outfall installed to the township’s standard.