Storm drainHolladay City
Cottonwood Lane storm drain.
Storm drain reconstruction along an active Holladay corridor. New inlets, conveyance pipe, and outfall structures with full traffic control.
Project detail
The work,
in detail.
ClientHolladay City
LocationHolladay, UT
Year2024
RoleGeneral contractor
Duration~2.5 months
Contract valueOn request
StatusOn schedule
Scope of work
- New storm inlets and catch basins
- Conveyance pipe (18–36 in. RCP)
- Outfall structure and erosion control
- Full traffic control on a live corridor
On the job
Cottonwood Lane was a storm drain reconstruction on a busy Holladay street. The work went in while traffic kept moving, which meant tight phasing and a traffic-control plan that actually held up day to day.
New inlets, pipe, and an outfall structure were installed and tied in, with erosion control in place before the wet season.
Got a job
Does your project look like these?
Send us the plans and a deadline. If it’s a job for our crew, we’ll have a clean number back on your timeline.